Abatement Abatement/Demolition Asbestos Asbestos/Demolition
Asbestos Abatement Microbial Remediation Demolition
EXPERIENCE
  Abatement
Mosler Safe-Hamilton, OH
Clean Ohio Revitalization Fund - Complete asbestos abatement and removal of 15,000 Lf of thermal system insulation; 50,000 LF of transite board; 25,000 LF of acoustical plaster as well as recovery and recycling of fluorescent bulbs and ballasts.
Kettering School district - Kettering, OH
Various Projects - Complete abatement and removal of 15,000 LF of asbestos containing ceiling tiles, 7,500 LF of floor tile and mastic. Removal and recovery of fluorescent bulbs and PCB ballasts.
  Abatement/Demolition
Terminal Management - Cincinnati, OH
Removal and disposal of 20,000 LF of asbestos containing thermal systems insulation and 3,000 SF acoustical plaster. Demolition and removal of all heating units and associated piping.
University Hospital - Cincinnati, OH
Various Projects - Complete removal and disposal of 2,500 LF of asbestos containing thermal system insulation: 6,000 SF of floor tile and mastic; and 2,500 SF of acoustical plaster.
West Clermont Local School District – Cincinnati, OH
Perform operations and maintenance of facilities district-wide.
  Asbestos
Wright Patterson Air Force Base – Dayton, OH (Area B)
Removal of asbestos containing pipe insulation, floor tile mastic and acoustical ceilings.
Colliers International
Remove asbestos contaminated materials to allow demolition phase to maintain proposed schedule.
  Asbestos/Demolition
University of Dayton – Marycrest Hall, Phase I
Removal and disposal of asbestos pipe insulation, floor tile and mastic. Demolition of the core washroom facilities on all seven floors. Mechanical demolition in lower service areas. Work performed and completed in the specified timeframe.
Brighton Center – Messer Construction, Butler, KY
Remove asbestos containing materials throughout the structure and boiler facilities. Completely gut the facility to allow state-of-the-art renovation process. Completely remove the front façade of the structure. Work performed in a timely fashion while encountering winter weather.
  Asbestos Abatement
Schumacher Dugan Construction – Cincinnati, OH
Operators Union Local 18 Main Offices
Remove asbestos floor tile and mastic in multiple phases to allow normal operations to continue. Work was performed ahead of schedule in all phases.
Cincinnati Bulk Terminal – Cincinnati, OH
Remove all exterior transite panels while using lifts and heavy equipment. Procedures were followed to prevent accidents including working 30 feet over the Ohio River while the client’s daily operations remained intact.
  Microbial Remediation
Walgreens Corporation – Cincinnati, OH
Full negative pressure containment for removal and disposal of mold contaminated drywall board and framing, carpet, ceiling tiles and vinyl flooring. After removal, the entire area was HEPA vacuumed, cleaned and encapsulated with an anti-microbial agent.
CVS Drugstore - Columbus, OH
Full negative pressure containment for removal and disposal of mold contaminated drywall board, fiberglass insulation and framing, carpet, ceiling tiles, cabinetry and vinyl flooring. After removal, the entire area was HEPA vacuumed, cleaned and encapsulated with an anti-microbial agent.
Gambro Health Care - Cincinnati, OH
Removal and disposal of mold contaminated dry wall board and frame, ceiling tile and grid system, vinyl flooring. All exposed surface were wiped down, HEPA vacuumed, cleaned and encapsulated with an anti-microbial agent. All work was performed under full negative pressure containment  preventing cross contamination.
Kinder Care Knowledge Learning Center
Removal and disposal of mold contaminated dry wall board and frame, ceiling tile and grid system, vinyl flooring. All exposed surface were wiped down, HEPA vacuumed, cleaned and encapsulated with an anti-microbial agent. All work was performed under full negative pressure containment  preventing cross contamination.
Clear Channel, Inc - Dayton, OH
Corporex, Inc. - Florence, KY
Remove mold-impacted drywall in renovated areas. Treat remaining surfaces to prevent future growth.
Chuck E. Cheese Corporation – Southern OH, Kentucky, Tennessee
Provide assistance during renovation process in the event mold-impacted materials are discovered. Disinfect and sanitize areas upon completion.
Walgreen’s Corporation – Cincinnati, OH and Hartwell, OH
Remove impacted materials from lower levels of facilities. Disinfect and treat areas for a clean final product.
  Demolition

Stephen Bell Elementary – Kettering, OH

Compete interior demolition of dry wall partitions and framing, plaster ceilings, concrete slabs. Load bearing CMU walls and all flooring.
Madeira High School – Madeira, OH
Compete interior demolition of dry wall partitions and framing, plaster ceilings, concrete slabs. Load bearing CMU walls and all flooring. Cutting of metal roof deck penetrations for the addition of new mechanical. Site work demolition included removal of sidewalks  and parking lot while providing clean fill and final grade.
Biggs Supermarket – Delhi Location, Cincinnati, OH
Full interior gut out of Kmart store for the future Biggs retail/grocery store. Demolition included removal of all dry wall partitions, ceilings, restrooms, concrete slabs, flooring and mechanical equipment.
580 Building - Cincinnati, OH
Multi-level downtown Cincinnati office building. Demolition and removal of drywall partitions and framing, flooring, ceilings, plumbing fixtures and pipes, mechanical equipment and duct work. Dismantling and removal of two storey vault, escalators, and elevators. Also demolished and removed were concrete slabs, roofing, brick and CMU block facades well as some miscellaneous site work.